Taiwan
Transfer the cable from CLV to shore side
Client:
SOC
Type services:
Handling & Storage
Total cable length:
19 km
Year:
2021
Transfer the cable from CLV to shore side.
Taiwan
Transfer different array cables
Client:
SOC
Type services:
Handling & Storage
Total cable length:
19 km
Year:
2021
Transfer the cable from CLV to shore side.
Taiwan
WIND was hired to store the batch 2 cables
Client:
SOC
Type services:
Storage
Total cable length:
17 km
Year:
2020
WIND was hired to store the batch 2 cables at there storage area in Taiwan.
Taiwan
Transfer different cables from a transport vessel to our storage
Client:
SOC
Type services:
Handling & Storage
Total cable length:
30 km
Year:
2020
WIND was hired to transfer different cables from a transport vessel to our storage area in Taiwan.
Saudi Arabia
Transfer two power cables from a transport vessel to a cable laying barge
Client:
McDermottType
services:
Handling
Total cable length:
16km
Year:
2019
WIND was hired to transfer two power cables from a transport vessel to a cable laying barge. The cables were respectively 11km and 5km long and designed to transfer electricity from platform to platform and from platform to shore.